Decking Seren part 4)

I’m a bit late posting this as I actually finished it more than a week ago. It took a while because the gas locker sits on the deck but the gas pipe goes under it and once the deck is in place you can’t get to the pipe easily. So I laid the deck boards temporarily and put the locker in place. Screwed the locker to the superstructure then removed the deck from under it while I did the pipework. Then out the boards back and screwed them down (with stainless steel screws naturally). Finally fixed some rubbing strake around the edge. Looks OK I think and feels solid to walk on.

Photo before the rubbing strake was added