Deck #2 part2

Here’s the deck frame in place, note the fixed ballast in the centre and movable ballast on the starboard side. Might have to move that now I have two leisure batteries.

Deck boards fitted. The shorter board in the corner is deliberate, the gas locker fits here and the gas pipe and drain are through the gap into the well deck.

Next problem. Originally Seren would have had a small, central door but a previous owner enlarged it. He also cut a hole in the roof for a sliding hatch the size of the original door, then filled it in, badly. The stain on the lining next to the smoke alarm is the tell-tale. My plan is to reduce the doorway back to original size and fit a hatch to make access easier.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.